Create a Base That Won't Shift or Settle

Secure Sub-Grade Preparation in Merino

You're ready to pour concrete or lay pavement, but the ground beneath needs precise compaction, moisture conditioning, and elevation control to prevent cracking, shifting, and long-term failure. Merino's clay content and freeze cycles demand properly conditioned sub-grade for foundations, driveways, roads, and pads that support heavy loads and seasonal stress. Southwind Contracting provides sub-grade prep that delivers durable base layers, reduced shifting, improved drainage, and long-term stability across Merino and surrounding areas.

Farm structures and metal buildings around Merino and Brush often require reinforced base prep to handle equipment weight and weather exposure. Our experienced grading team uses proper equipment and compaction testing to ensure every layer meets engineering standards and supports your project's structural demands without settling or erosion.

Ensure a stable foundation with expert sub-grade preparation tailored to Merino's soil conditions.

Key Benefits of This Service

Sub-grade prep in Merino begins with excavation to the required depth, followed by soil conditioning to adjust moisture content and remove unstable material. We then apply base layers in lifts, compacting each layer with vibratory rollers and plate compactors to achieve target density and load-bearing capacity.

Southwind Contracting uses laser grading and moisture testing to confirm proper slope and drainage before final compaction. Colorado's freeze–thaw cycles can destabilize poorly prepared bases, so we reinforce sub-grade layers with proper material selection and controlled compaction. Our team coordinates with engineers and inspectors to meet project specs and local codes.

After compaction, we verify elevation accuracy and surface smoothness to ensure your pad or roadway is ready for concrete, asphalt, or additional structural layers. You'll receive a finished base that resists shifting and supports long-term performance under heavy use.

How Our Process Works

Here are answers to frequently asked questions about sub-grade prep and how we handle challenging soil conditions in Merino.

Black mountain range logo on a white background.
Why is sub-grade prep important?
Proper sub-grade prevents settling, cracking, and drainage issues. Without it, foundations and pavements fail prematurely due to unstable soil and moisture infiltration.
Black mountain silhouette.
What equipment do you use for compaction?
We use vibratory rollers, plate compactors, and laser grading systems to achieve precise density and elevation. Each tool is selected based on soil type and project requirements.
Black mountain range silhouette against a white background.
How do you handle clay-heavy soil?
Clay requires moisture conditioning and additional compaction lifts. We adjust water content and use reinforced base material to prevent expansion and shifting during freeze cycles.
Black mountain range icon on a white background.
Can sub-grade prep be done in winter?
Yes, but cold weather affects compaction and moisture control. We adjust methods and monitor conditions closely to ensure proper density and stability in Merino's climate.
Black mountain range icon on white background.
How long does sub-grade prep take?
Most residential pads take one to two days depending on depth and soil conditions. Larger commercial sites or complex grading may require additional time.

A stable base protects your investment and prevents costly repairs down the road. Get in touch today to schedule sub-grade prep in Merino and build on a foundation designed for long-term performance.